4, Targovska str., entr. A, floor 3, ap.4,Elhovo, Bulgaria
Tel./Fax: +35947888583
Elvira Hristova - Mob: +359 899 157 925;
e mail: [email protected]
skype: newhomesv.com

Industrial enterprise in the village of Srem, 15 km from Topolovgrad
Srem, Topolovgrad | 3400.00 sq.m. | Apartments
€ 260 000


Ref. No. E1563
City Srem
Region Black Sea Coastline
Property Type Apartments
Built-up Area 3400.00 sq.m.

Details
  Year Build 1988
  Floors 1
  Status For sale
  Price per sq.m 62
  Size 3400.00 sq.m.


Desription
For sale an industrial enterprise in the village of Srem, about 15 km away from the town of Topolovgrad, Topolovgrad municipality

Location: Haskovo Region, the village of Srem
Total Area: 3400 sq.m
Yard: 13200 sq.m
Floors: 1 & 3
Price: € 260000
Price per m2: € 61,76

The village of Srem is a part of the Municipality of Topolovgrad, Haskovo Region, southern Bulgaria. It is situated about 15 km away from the municipality center - the town of Topolovgrad, about 100 km away from the regional center - the town of Haskovo, about 20 km away from the town of Elhovo and about 120 from Burgas city and the port. The village of Srem is in a strategic location and is located near two borders with the Republic of Turkey (checkpoint Lesovo - about 35 km away) and with the Republic of Greece (checkpoint Kapitan Petko Voyvoda - about 60 km away). The village is situated at the foot of the Sakar Mountain, on the bank of Tundzha river. The population is about 360 people. The village has internet and mobile access.

The industrial enterprise is situated on a production site with an area of 13,200 sq.m, of which the buildings have a built-up area of about 3,400 sq.m. and a large territory surrounded by a concrete fence, reinforced concrete stakes and wire netting (480 meters), in which there is a built pool (fire tank) measuring 12 x 3 meters. Asphalt and concrete pavements have been completed; retaining wall and other site infrastructure facilities; it is built up with production and service buildings of the production hall. Plumbing, sewerage, electricity supply and site lighting are partially operational. Non-functioning site lighting, functional telephony to the checkpoint. A gantry crane - 8t. - is located between the buildings outdoors, placed racks for materials, overhead crane - 2t.: 8 pcs. cyclones for aspiration of the carpentry hall. There are two power transformers with power 400 kVA in the transformer substation. There is a new compressor - 10 cubic meters and two steam boilers, a pumping station, a septic tank.

Built-up area:

№ 1 - Administrative building, which represents a solid three-storey building, a built-up area of 167 sq.m;
- Supporting construction - monolithic type; brick walls, plastered and painted; ceiling - reinforced concrete; roof 2T panels with hydro- and thermal insulation;
- Joinery - wooden;
- Floor - mosaic tiles, linoleum and carpet;
- The building is in very good condition.

№ 4 - Industrial hall (production building) - a solid single-storey building, a built-up area of 1333 sq.m and height 10 meters;
- Supporting construction - single and strip foundations; prefabricated reinforced concrete elements - columns and beams; walls - reinforced concrete panels; ceiling - reinforced concrete; roof 2T panels with hydro- and thermal insulation;
- Joinery - metal;
- Floor - concrete flooring;
- The building is in very good condition.

№ 5 - Industrial hall - a solid single-storey building, a built-up area of 609 sq.m and height 7.50 meters;
- Supporting construction - prefabricated reinforced concrete elements - columns and beams; roof 2T panels with hydro- and thermal insulation;
- Joinery - metal;
- Floor - concrete flooring.

№ 6 and № 7 - Production building (boiler and compressor) - a solid single-storey building, a built-up area of 2 x 111 sq.m = 222 sq.m and height 6.00 meters;
- Supporting construction - prefabricated reinforced concrete with waterproofing of the roof;
- Joinery - metal;
- Floor - concrete flooring.

№ 8 - Industrial hall - a solid single-storey building, a built-up area of 605 sq.m and height 10.60 meters;
- Supporting construction - prefabricated reinforced concrete elements - columns and beams; roof 2T panels with hydro- and thermal insulation;
- Joinery - metal;
- Floor - concrete flooring.

№ 9 - Production building (substation) - a solid single-storey building, a built-up area of 74 sq.m and height 4.50 meters;
- Supporting construction - prefabricated reinforced concrete panels;
- Joinery - metal;
- Floor - concrete flooring with stucco.

МС - Industrial building (kitchen) - a solid single-storey building, a built-up area of 156 sq.m and height 2.60 meters;
- Supporting construction - monolithic construction - single and strip foundations; brick walls with plaster and painting; ceiling - reinforced concrete roof plate; faience in the kitchen;
- Joinery - wooden;
- Floor - concrete flooring, mosaic tiles, mosaic;
- Plumbing, sewerage, electrical installation, heating, ventilation and built-in refrigerator are installed;
- The building is in very good condition.

МС - Industrial building (canteen) - a solid single-storey building, a built-up area of 169 sq.m and height 3.20 meters;
- Supporting construction - monolithic construction - single and strip foundations; brick walls with plaster and painting; ceiling - reinforced concrete roof plate;
- Joinery - wooden;
- Floor - concrete flooring, mosaic tiles, mosaic;
- Plumbing, sewerage, electrical installation, heating, ventilation are installed;
- The building is in very good condition.

КПП - Industrial building - a solid single-storey building, a built-up area of 16 sq.m and height 2.60 meters;
- Supporting construction - brickwork and roof reinforced concrete plate with waterproofing and additionally laid sheet metal;
- Joinery - metal;
- Floor - linoleum.

Warehouse - Industrial building - a solid single-storey building, a built-up area of 98 sq.m and height 3.00 meters;
- Supporting construction - brick walls, reinforced concrete belt and plate;
- Joinery - wooden;
- Floor - concrete flooring.

Type of construction: monolithic / brick / panel
Year of construction: 1988
Stage of construction: Permission to use granted